Treasure Chest Casino Parking Lots
Size of Project
9 Acres
Location
Kenner, LA
Owner
Boyd Gaming
Industry
Infrastructure
Overview
Paving the way for a new casino.
The RNGD Infrastructure team is a partner with W.G. Yates Construction on Boyd Gaming’s Treasure Chest Casino project in Kenner, LA. RNGD is provided a complete site package for two phases of work that consist of the construction of a Remote Parking Lot followed by sitework for the construction the new building. RNGD self-performed mass grading, excavation, demo and utility installation, and relocation. The scope also required the export of unsuitable soil along with the import of engineered fill to accomplish desired substructure construction.
Remote Parking
- 9 Acre Lot Site
- 4 Acres of Paving
- (172,500 SF)
- 1,000 LF Storm Drain
- 900 LF Fire Water Main
- 1400 LF Domestic Water Line
- 3,000 LF Curb and Gutter
- 5,100 SF Concrete Sidewalk
- 114,000 CY Earthmoving (import, export)
- Detention Pond
- $4,000,000
- 60 Day Schedule
Main Site
- 12 Acres of Asphalt Paving Removal
- 30,000 CY of Earthwork
- 23,000 Tons of Limestone Base
- 5,000 LF of Storm Drainage
- 3800 LF of Water Main
- 1400 LF of Sewer Force Main
- Sewer Lift Station
- Detention Ponds
- $4,000,000